Skip to content
Home
Manufacturing
11 KV AB switch
11 KV Horn Gap (HG) Fuse
33 KV Horn Gap (HG) Fuse
33KV Double Break Isolator with Earth
33KV Double Break Isolator
Distribution Box
Electrical Panels
Interlocking Tiles
RCC Poles
RCC Slabs
Steel Fabrication
Projects
Services
Pooja Industries
About
Contact
Arlem, Margao - Goa
Email us: info@eleconconstructions.com
Follow Us On:
Home
Manufacturing
11 KV AB switch
11 KV Horn Gap (HG) Fuse
33 KV Horn Gap (HG) Fuse
33KV Double Break Isolator with Earth
33KV Double Break Isolator
Distribution Box
Electrical Panels
Interlocking Tiles
RCC Poles
RCC Slabs
Steel Fabrication
Projects
Services
Pooja Industries
About
Contact
Get In Touch
About Us
With a rich experience in the field of electrical and civil works, we have built our reputation, through our excellent service and high standard of workmanship in Electrical, Mechanical, Manufacturing and Civil domains.
Contact Info
Goa, India
info@eleconconstructions.com
+918326712379
Search here...
Projects
Elecon Constructions
>
Projects
Internal Electrification of College Block and Hospital Block of Kannur Medical College
Supply, Erection, Testing & Commissioning of 33 KV D/C line from Verna to Pajifond, Margao
Providing Internal Electrical conduits for Bharat Hotels (7 star) Hotel Inter-Continental
Supply, erection, testing, and commissioning of 7 x 100 KVA distribution transformer centers with associated HT/LT lines and LT line retrenching in Camorlim.
Renovation of Distribution Transformer centres in Curtorim, Loutolim, Raia, Macazana, Chandor and other areas under sub Div – I
Supply, Erection, Testing & Commissioning of 33 KV/ 443 Volt, 2000 KVA substation including laying and termination of 33 KV XLPE Cable
Supply, erection, testing, and commissioning of 11 KV metering structure, 4 KM extension of 11 KV line, and underground cable to supply 1000 KVA to M/s Bits Pilani at Sancoale.
Supply, Erection, Testing & Commissioning for releasing 33 KV Power Supply to M/s Micro Labs Pvt. Ltd.
Supply, erection, testing, and commissioning of 33 KV, 3.5 MVA transformer with AVR, underground cable, 4-pole structure, switchgears, 33 KV VCBs, and metering cubicle
Replacement of PVC LT wires with ANT/GNAT conductors and erection of new poles in Gaondongrim and Cotigao under S/D III, Canacona.
Revamping and providing power supply lines to improve voltage in V.P. Mollomem and V.P. Cazur areas of Quepem Constituency under the special component plan for scheduled tribes.
Work of revamping of 30 Nos of Distribution Transformer Centres at various places in Canacona Taluka under the jurisdiction of Sub Div III
1
2
3
4
Office No. 111, 1st floor, The Court, Crossroad, Arlem, Goa info@eleconconstructions.com
Get In Touch
9049878444